By rethinking the role of parking in modern construction, APS helps developers reduce costs, unlock valuable space, and accelerate project timelines
1. Cut Excavation & Site Preparation Costs
Excavation is one of the most underestimated — and expensive — aspects of traditional parking. Multi-level garages require:
- Deep pits and massive foundations
- Extensive soil removal and retaining walls
- Complex waterproofing and grading
- Lengthy inspection timelines
APS changes the game.
Our modular, compact systems reduce the need for deep excavation. Many can be built entirely above ground or with shallow pits, drastically cutting:
- Soil removal
- Equipment needs
- Labor and inspection delays
– Up to 40% savings on excavation in challenging urban sites.
2. Reduce Structural & Material Costs
Steel and concrete are among the most expensive components in any structure. Traditional parking requires:
- Long drive aisles and turning space
- Ramps and vertical circulation cores
- Heavy structural framing for non-revenue-generating space
APS = Smarter Building
Our systems eliminate:
- Ramps
- Stairwells and elevators dedicated to the garage
- Wide vehicle access corridors
Cars are stacked or shuttled into optimized configurations, cutting your material usage by 30–50%, depending on the site.
Bonus: That saved space? You can repurpose it into units, amenities, retail frontage, or green areas that drive long-term revenue.
3. Accelerate Your Timeline
Every week saved in construction is a week closer to ROI.
Traditional garages delay vertical work due to:
- Concrete ramp curing
- Sequencing issues
- Complex structural pours
APS speeds up the process.
Pre-engineered and quick to install, our systems allow your team to begin building sooner. Many developers report 4–8 weeks saved in overall construction time.
That’s faster delivery, lower overhead, and quicker lease-up or sale.
Bonus: Unlock Urban Incentives
Cities love smart parking. Choosing APS may help you qualify for:
- Density bonuses
- Reduced parking minimums
- Expedited approvals
- LEED and green building credits
APS doesn’t just save — it opens doors to greater entitlements and long-term project value.
Real Example: From Theory to Results
Project: 6-story urban multifamily
Traditional Parking Estimate:
- Excavation: $800,000
- Concrete + Ramps: $1.2M
- Total: $2M
APS Solution:
- Excavation: $400,000
- APS System: $950,000
- Total: $1.35M
– Savings: $650,000
Bonus: Reclaimed 2,500 sq. ft. used for a café = $3,500/month lease income
Discover Your Project’s Savings Potential
Every site is different. But with a quick review of your plans, WVIP can provide a free Building Analytics Report, outlining:
- Estimated cost savings
- Custom layout recommendations
- ROI timeline
- Visual schematics for your site
Ready to find out how much you could save?
Contact us to schedule a free APS design consultation — and start building smarter today.
