Skip links
For cost consultants

Parking costs you can price early

Automated and mechanical parking changes the excavation, the structure and the floor area a garage needs. We give you the system scope, the inputs and the drawings to price it against a conventional garage, early and in one package.

01 — What you get from us

A scope you can put a number on

Every system is engineered, supplied, installed and maintained by the same team under one contract, so the scope you price is the scope that gets built. You get the inputs for an elemental estimate, not a brochure.

01

System scope in writing

Equipment, controls, installation and commissioning are listed separately from the base-building works, so nothing is counted twice or left out.

02

Budget estimate in 72 hours

Send a site plan and a parking count. You get a budget estimate within 72 hours and code-approved drawings within four to six weeks.

03

Base-building inputs

Pit depths, clear heights, slab loads and power demand come with the layout, so excavation, structure and electrical can be priced with the system.

04

Life-cycle figures

Preventive maintenance is offered as a service agreement, so operating cost can sit next to capital cost in the same comparison.

02 — Where the money moves

Equipment up, building down

An automated or mechanical system adds equipment cost per space and removes building cost per space. These are the lines that usually move. Try the numbers in the cost comparison tool, then ask us for figures for your site.

01

Excavation and shoring

Without ramps and drive aisles, the same cars fit in less volume below grade, which can take out a level of excavation, shoring and waterproofing.

02

Structure and finishes

Fewer slabs, columns, ramps, lights and finishes are needed for the same number of cars.

03

Floor area at grade

With no ramp, ground-floor area goes back to units, retail or amenity space.

04

Running costs

In a fully automated garage, engines are off and no one walks through the storage area, which can reduce lighting and ventilation needs.

Free consultation

Send us the plan and the count.

You will have a budget estimate within 72 hours and code-approved drawings within four to six weeks. All figures are estimates until we review your site.