For contractors and construction managers

One trade for the whole parking system

We design, supply, install and commission the system with our own crews, working to your schedule and coordinating directly with your structural, electrical and mechanical trades.

01 — What you get from us

One party accountable for the system

One contract covers engineering, supply, installation, commissioning and maintenance, so there is one party to coordinate with and one party responsible for the system from shop drawings to handover.

01

Coordination drawings

Shop drawings, loads, embeds and sleeves are issued early, so pits, slabs and conduit are built right the first time.

02

Our own installation crews

Our crews set the steel, rails, lifts and shuttles and work directly with your trades on site.

03

A schedule you can plan around

Delivery and installation are sequenced against your construction schedule, with clear dates for site readiness and permanent power.

04

Commissioning and handover

We test the system, tune the controls and complete the required inspections before handover, then train the building staff.

02 — Site readiness

What the site needs to be ready

Most delays come from the interfaces between trades. These are the items we confirm with you before the first piece of steel arrives.

01

Pits and slabs

Pit depths, slab levels and tolerances for rails and platforms.

02

Power and controls

Permanent power, disconnects and conduit to the control panels and entry cabins.

03

Fire protection and ventilation

Sprinkler layouts around platforms and racks, and ventilation as the local fire and building codes require.

04

Access and lifting

Delivery access, laydown space and lifting for steel and equipment.

Free consultation

Bring us in at tender.

Send the drawings and the schedule. We will confirm the scope, the interfaces with your trades and the installation dates.