Skip links

Project · Completed 2014

Downtown Condos

Completed in 2014 for Parallax Developments.

Downtown Condos, building exterior
508 Wellington Street, cars on stacker platforms

01 — Project facts

About the project

Downtown Condos was completed in 2014 for Parallax Developments, with Sweeny & Co Architects as the architect. WVIP delivered 16 parking spaces with mechanical stackers in three configurations, each matched to the space available in its part of the garage. A stacker parks cars on steel platforms that rise and lower, so two cars share the floor area of one conventional stall. The building gets the parking it needs in a more compact garage, with less excavation and less floor area given to ramps and drive aisles.

DeveloperParallax Developments

ArchitectSweeny & Co Architects

StatusCompleted, 2014

Parking systemMechanical stackers, 16 spaces in 3 configurations

Parking spaces16

02 — On site

The system in use

Downtown Condos: parking system in operation
Downtown Condos: parking system in operation
Downtown Condos: parking system in operation
Downtown Condos: parking system in operation

03 — More projects

Other WVIP installations

Completed · 2008

In progress

Free consultation

Planning a project? Talk to us early.

Bring your site plan or drawings. We will show you which system fits and how many spaces you can gain.